Beartooth's primary work focus is the Dam Safety. We use high pressure water jetting to remove mineral buildup from pressure cells; foundation drain; monolith drain; turbine pit drain; piezometers; floor drain, roadway drain; spillway drain; form drain, face drain; and weep holes as they relate to dams.
Hydrodemolition of .25" - Full Deck removal, piers, columns, abuts and more. We utilize the best equipment in the world to complete your project.
Hydrodemolition of 7" of concrete from the entire face of American Falls Dam spillway. We also completed the project utilizing our water treatment plant.
Beartooth can provide the water treatment during the hydrodemolition process. We can even recycle and reuse water if needed for your project.
Beartooth can video pipes or drains ranging in size from 1.5" to 48" or bigger. A DVD can be provided showing the before and after results.
Beartooth can provide many different methods for hydrodemolition of your concrete.
One of the successful projects was completed at the Cascade Locks on the Colombia River. It required a 10" concrete removal all while recycling 100% of the water.
Another successful project was completed at Moyie Dam in Idaho. It required 3"-7" concrete hydrodemolition with zero access from the bottom. Project was completed a year ahead of schedule and within budget.
Shown here is our newest addition to the equipment fleet. The new Aquajet 750V. It was utilized on projects all over the country this year by our crews.